Project for the implementation of a technical center for ANINF.
Project Objectives
1. Computer Cabling : Every detail of computer cabling has been meticulously planned to create a robust digital network. This infrastructure ensures fast and secure data transmission, a crucial element for your critical IT operations.
2. False Floor in the Computer Room : The installation of a false floor in the computer room has been carried out to create an organized environment, optimizing space and simplifying cable management, thereby facilitating interventions and upgrades.
3. Cisco Router and WiFi Access Points : Cutting-edge Cisco routers, accompanied by strategically positioned WiFi access points, form a robust wireless infrastructure, providing stable and secure connectivity throughout the company.
4. Cisco Switch : The Cisco switch centralizes network traffic management, optimizing bandwidth distribution and ensuring maximum network performance.
5. Two 250kVA Generators : The presence of two 250kVA generators ensures uninterrupted power supply, providing crucial redundancy in case of a main power grid failure.
6. 20kVA Rectifier : The addition of a 20kVA rectifier consolidates the power supply, effectively regulating current and protecting sensitive equipment against electrical fluctuations.
Achievements and Benefits
Achievements :
- Sophisticated computer cabling ensures fast, stable, and secure connectivity, boosting operational efficiency.
- The false floor in the computer room creates an organized environment, simplifying maintenance and fostering installation flexibility.
Benefits :
- Cisco equipment provides cutting-edge network connectivity, meeting the growing requirements of your business.
- Generators and the rectifier ensure uninterrupted power supply, ensuring operational continuity in all circumstances.