- Steven OBAME
- Projects
- Read Time: 1 min
- Hits: 109
ARCEP Project
Implementation Project for the Core Network for UIT Expo at ARCEP
Project Objectives
1. Telecom Rack : The establishment of a dedicated Telecom Rack provides a structured and secure space to host essential network equipment, ensuring efficient management and maximum availability.
2. Cisco Equipment - Router and Switch : The use of advanced Cisco equipment, including routers and switches, ensures reliable performance, efficient network management, and optimal connectivity.
3. Engineering Services for Implementation : Our highly skilled engineering team is committed to implementing these advanced technological solutions, ensuring seamless integration and optimal performance.
Achievements and Impacts
Achievements :
- The Telecom Rack provides an organized infrastructure, facilitating maintenance and accessibility to equipment.
- Cisco equipment ensures exceptional network performance, meeting the high bandwidth needs of the UIT Expo.
Impacts:
- Robust connectivity enhances the experience of participants, encouraging interaction and collaboration.
- Engineering services ensure successful implementation, minimizing downtime, and maximizing productivity.